Closure of Ponte della Veggia bridge
The Ponte della Veggia bridge will be closed for structural work from 16 June to 16 August 2025.
The Ponte della Veggia bridge will be closed to vehicle traffic. As a result, all traffic will be diverted to the bridge on the Strada Pedemontana (S.P. 467), which will serve as the sole river crossing during this period.